Home > PUBLICATION > BRIDGE Magazine >

Issue 48



2012-11-27
BRIDGE




                             
 
FOCUS
Dream, Fervor and Misunderstanding of Chinese Suspension Bridge
 
Technical and Economic Advantages of Multi-pylon Long Span Continuous Suspension Bridge

COVER STORY

INFORMATION

TECHNOLOGY

OVERSEAS FRONTIER
Bridge Projects and Maintenance Policy in Norway
—An interview with Mr. Børre Stensvold, Director of Bridge Section, Norwegian Public Roads Administration
 
TECHNICAL RESEARCH
The Application and Development of Prestressed Concrete Bridges with Corrugated Steel Webs in China
 
Static Load Test and Analysis for 80m Long Continuous Prestressed Concrete Box-girder Bridge

NEW DISIGN
Thinking and Exploration of Bridge Conceptual Design
 
Design and Innovation of the Second Jiaojiang Bridge in Taizhou, Zhejiang

KEY LABORATORY
Designing Problems of Complicated Components Solved by Structure

CONSTUCTION SPOT
The Bored Piles Construction with Super-large Diameter for Jiaoshao Bridge

MANAGEMENT AND MAINTENANCE
Analysis and Suggestion for Reinforcement Technology with Polymer Mortar and Wire Mesh Net

Reinforcement System Application by Prestressing with Bond

BRIDGE ANTI-SEISMIC
Seismic Vulnerability Analysis of Isolated Bridge

KEY PROJECTS  
   

CULTURE
FIGURE
Bridge Expert Mr. Zhao Yucheng
 
BRIDGE AESTHETICS
About Bridge Aesthetics
 
BRIDGE SALON
Bridge Aesthetics and Cost(Ⅱ)

Book Review
Recommendation of Cable-Stayed Bridges written by Prof. H. Svensson
 

Marketplace Links
 Coming soon
 
Coming soon
Buy a link now>
 
Contact Us  |   Terms & Condition of Use   |  Job  |  Awards  |  Advertise   |  Events
Copyright @ 2011 - 2012 BRIDGE MAGAZINE All Rights Reserved