Home > KEY PROJECTS >

New Progress of Taizhou Yangtze River Bridge



2012-10-22
BRIDGE


   
                           

Superstructure and steel bridge deck pavement of Taizhou Yangtze River Bridge were tested on 16 October. Delicate management and debugging of mechanical equipments are promoted to ensure the bridge opened to traffic on time.
 
It is reported previously that on the morning of September 26, the Bridge was smoothly through the acceptance. The construction unit introduced that this Bridge can be opened to traffic during the year.

Taizhou Yangtze River Bridge was located between in Taizhou, Zhenjiang and Changzhou, 57 km east of Jiangyin Bridge, 66 km west of Runyang Bridge. The construction of new Taizhou Bridge will greatly improve the road network, strengthen the development of Taizhou, Zhenjiang and Changzhou, promote the balanced regional economic development in the Yangtze River area and improve the conditions of the Yangtze River shipping.
 
The 62.088-kilometer-long Taizhou Yangtze River Bridge with a total investment of RMB 9.37 billion would finish five and half years' construction which was officially started from December 26, 2007. The whole bridge adopted the standard of bidirectional six-lane highways and the main bridge crossing the Yangtze River adopted three towers double span steel box girder suspension with the 2×1080 meters main span, which was the initiative all around the world.
 
Photo from Changzhou official website.













Marketplace Links
 Coming soon
 
Coming soon
Buy a link now>
 
Contact Us  |   Terms & Condition of Use   |  Job  |  Awards  |  Advertise   |  Events
Copyright @ 2011 - 2012 BRIDGE MAGAZINE All Rights Reserved